Call usMon–Fri 8–12 and 13–17.30Ask for a quoteQuote
Dry-stone wall terraces on a grassy slope planted with lavender

Slope stabilisation in TicinoWood, stone and plants instead of concrete.

Stabilising and retaining works in natural materials, which blend into the landscape instead of cutting across it.

What it is

Works that do the job of concrete, in favour of the landscape.

Natural engineering stabilises and supports the ground using natural raw materials together with living material. We use wood, stones and pebbles, plants and trees, or entirely sustainable materials.

So the work blends naturally into the landscape: a double-walled log crib, for instance, does the job of a reinforced-concrete retaining wall with a far lighter footprint.

What we build

With the techniques of bioengineering

  • Log cribs

    Single or double log walls that hold the slope.

  • Wattles and fascines

    Woven branches and timber that keep the soil in place.

  • Banks and retaining works

    Stabilised slopes and support structures.

  • Paths, steps and bridges

    To cross and enjoy sloping ground.

  • Channels and check dams

    To guide water without erosion.

  • Replanting

    With native species, replanted on site.

How we work

Careful planning is the key.

  1. 01

    Site analysis

    We study the slope, the soil and the water, on site.

  2. 02

    A tailored design

    Natural solutions based on calculations that take every deciding factor into account.

  3. 03

    Careful execution

    With the natural material already on site, wherever possible.

  4. 04

    Replanting

    With native species, so the work lasts and blends in.

One of our jobs

A slope in reinforced earth

2024: a steep slope rebuilt, from the dig to the finished bank.

  1. The dig at the foot of a slope, the first mesh and a mini excavator

    1Digging into the slope

  2. The steel mesh laid against the excavated slope

    2The mesh laid

  3. The reinforced-earth wall rising layer by layer

    3Layer by layer

  4. The finished terraced bank, with grass and the woods above

    4The finished bank

FAQ

Frequently asked questions

What is a natural engineering project for?

To reduce or avoid concrete structures in favour of natural works that perform the same structural role and respect the landscape. Whole plants or parts of them are used, above all in log cribs, wattles and fascines.

What materials do you use?

Wood, stones and pebbles, together with plants and trees. Wherever possible we use the natural material already on site and replant with native species.

What are your proposals based on?

On detailed site analysis and calculations that take every deciding factor into account: specialist knowledge, precise planning and careful execution are the basis of a lasting solution.

Is the consultation free?

Yes: we come and look at the ground and answer all your questions, with no obligation.

Let’s talk it over on site.

The site visit is free, anywhere in Ticino. Then we write you a fixed price.

Ask for a quote